SKU 05-CM120X Category: Tags: , , ,

Mobile DC fast charger rental — 30kW DC (CCS2)

The ChargeMakers 30kW DC mobile fast charger is a portable fast charger that you can rent by the week or month. All it needs is a 63A three-phase connection: no permanent installation, no grid upgrade. The CCS2 plug adds approximately 150 km of range per hour. If you want to rent a fast charger for a depot, construction site or temporary location, we deliver and install it, including a 4G connection and online dashboard.

Pros and cons:

⊕ Rent a temporary fast-charging solution without investment
⊕ Ready to use right away: plug & play on a 63A connection (draws max. 47A)
⊕ Adds 150 km of range per hour or more on most EVs
⊕ Proven in logistics and construction — from e-truck tests at the depot to emission-free construction in a Natura 2000 area
⊗ With 1 CCS2 connection you can charge 1 vehicle at a time

PRODUCT

Specifications

Weight 50 kg
Dimensions 45 × 63 × 100 cm
Charging power

30kW

Required connection

63A CEE (three-phase power)

Connector

CCS2

Vehicles charged simultaneously

1

Controls

Touchscreen + RFID

Material

Aluminum

Suitable for

All vehicles with CCS2 connection, Liebherr, Urban Mobility Systems (UMS), Aiways, Audi, BMW, BYD, Citroën, Cupra, DS, Fiat, Ford, Honda, Hongqi, Hyundai, Jaguar, KIA, Lexus, Lotus, Lucid, Lynk & Co, Mercedes, MG, MINI, NIO, Nissan, Opel, Peugeot, Polestar, Porsche, Renault, Rolls-Royce, Skoda, Smart, Tesla, Toyota, Volkswagen, Volvo, XPENG

CASE STUDIES

How customers use the 30kW mobile DC fast charger

Charging an e-truck at its own depot — GLS.

GLS has been using the mobile fast charger at its own depot for almost a year to field-test its e-truck: fast charging on its own premises, without having to install permanent charging infrastructure.

Zero-emission construction in a Natura 2000 area — Hanab.

Hanab deployed several of our mobile DC chargers simultaneously to charge batteries for electric construction equipment. This enabled completely emission-free construction in a Natura 2000 area.

Backup for its own charging infrastructure — RDR Electric, Belgium.

RDR Electric rented the chargers several times in Belgium to keep an e-truck charging while its own charging infrastructure was down. The mobile DC charger as a temporary backup: placed, connected, charging.

Test first, then invest — Pappen Olef, paper mill (DE).

Pappen Olef tested an eActros with a 600kWh battery pack using our 30kW DC mobile fast charger. The test was so successful that the planned 400kW fast charging installation was scaled down to a much smaller 2× 60kW system. This way, you know exactly what you need before you invest.

FIND YOUR SOLUTION

When should you choose 30kW DC — and when something else?

If a single vehicle needs a quick top-up, this 30kW mobile fast charger is the right choice: it is our most-rented DC power rating and runs on a 63A connection. If several passenger cars need to charge at the same time, take a look at the mobile dual-socket EV charger 2×22kW or the mobile EV charging hub with 6 charge points. If you are looking for more DC power — two e-trucks at the same time or short charging windows — then there is the 80kW mobile DC fast charger or the 160kW mobile DC fast charger.

30kW DC80kW DC160kW DC300kW DC (on request)
Connection63A CEE125A CEEPowerlockPowerlock
Charging speed30 kWh per hour80 kWh per hour160 kWh per hour300 kWh per hour
Two vehicles at the same time—✓✓✓
Most frequently used✓✓——

All chargers are 4G connected with remote support and are supplied, installed, and connected by ChargeMakers.

SMART OPTIONS

Get more out of your rental charger

More charging points on your connection

A mobile charging hub, mobile EV chargers and DC chargers work together as one system over 4G — without digging or a grid upgrade. Even during grid congestion.

Let visitors pay for their own charging

Open your rental chargers to more than 90% of all European charge cards. You set the kWh rate; we handle collection and payouts — available for rentals of 4 weeks or more.

SUPPORT

Frequently asked questions about the mobile fast charger

What power connection do I need to rent a mobile fast charger?

A 63A three-phase connection (CEE). You rent the 20-meter connection cable with it, so the charger doesn't have to be placed right next to the electrical panel.

Does the fast charger also work on a temporary connection, such as a construction site power supply?

Yes. The charger works on any power source that supplies 3-phase power with neutral and earth and can handle 47A per phase — permanent or temporary. We will check in advance what is available at your location.

Can the charger be placed outside on a construction site?

Yes. In practice, the chargers are used outdoors at construction sites, depots, and project locations, all year round.

Which vehicles and machines can I charge with it?

Anything with a CCS2 connection: passenger cars, electric vans, electric trucks and electric construction equipment. Charging swappable batteries for construction equipment has also been proven in practice.

How fast does 30kW DC charge?

The charger delivers approximately 30kWh per hour — roughly 150 km of range. Example: topping up a 100kWh battery from 20% to 80% (60kWh) takes about two hours.

Is 30kW enough, or do I need a 40kW fast charger?

A 40kW charger charges slightly faster, but places a heavier load on your connection. With 30kW, you charge over 360kWh overnight (12 hours) — enough for most e-trucks to charge from 20% to 100% — and leave more capacity on your connection.

How much does it cost to rent a mobile fast charger at a construction site or depot?

We rent by the week or month, and every rental is quoted individually: the price depends on the rental period, transport and accessories. Request a quote via the form.

Do you handle transport and installation?

Yes. We quote transport, installation, and instruction separately based on the location.

QUOTE

Request a rental quote

Fill out the request form and we'll get back to you — no obligation, no commitment.

Where can we reach you?
Share a few details, such as start date, number of charging points and rental period. Not sure yet? No problem — we'll work it out together.

We review your request personally and help you work out the right number of charge points, power and connection.

Scroll to Top

Order a charger? All orders placed in August will be sent from September 1. Enjoy your summer!