Google-Review-ChargeMakers

Charging point Installation
Completely carefree

The complete charging station installation within 2-3 weeks for a fixed price

ChargeMakers makes charging easy. This is not only important when choosing and using a charging point, but also during installation. Everything that comes withcharger installation we have accommodated in 2 clear packages. 

One package (Complete) where the charger will be placed close to the meter cupboard and a second package (Complete Plus) where more digging and cable is required. If customization is required, that is no problem, we are happy to make a tailor-made quotation. 

Whichever package you choose, you are always assured of a working charging station without surprises afterwards. Order the installation package together with the charging point.

All-in-1

Installation package Complete

719
689
incl. VAT (€569.42 excl. VAT)

Including

  • Installation of the charging point within 2 to 3 weeks
  • Mounting on the wall
  • 2 year warranty on the installation
  • Call-out charges
  • Labor and transport With the exception of the Wadden Islands, additional charge on request
  • Placing an extra group in the meter cupboard (up to 32A) 1 or 3 phase earth leakage circuit breaker, depending on the meter box. Excluding extension box if required.
  • Explanation of how your new charging point works
  • Excavation and repavement optional
  • Power cable 3 phase/4mm2 up to 10 meters
  • Data cable (UTP) up to 10 meters
  • Optional: Excavation and paving work excl. cables (€42.50 per meter incl. VAT)
  • Optional: Excavation and paving work incl. power cable and UTP (€55 per meter incl. VAT)
  • Optional: Upgrade from 4mm2 to 6mm2 power cable (€6 per meter incl. VAT) If you expect to charge with capacities higher than 16A/11kW, we recommend a 6mm2 upgrade.
  • Optional: Pole mounting instead of wall mounting incl. buried pole and mounting charging point (€72.50 incl. VAT) Charging via 3 phases at the same time is the fastest. If you have a 1-phase connection and you would like to charge 3 phases, you can request a conversion from your grid operator at mijn connection.nl.
  • Optional: Extension box for 1 earth leakage circuit breaker incl. mounting (€42.50 incl. VAT) If there is no room for the earth leakage circuit breaker in the group box, we will install an extension box
  • Optional: Adjust group cabinet from 1 to 3 phases incl. main switch, excl. application network manager (€169 incl. VAT) Charging via 3 phases at the same time is the fastest. If you have a 1-phase connection and you would like to charge 3 phases, you can request a conversion from your grid operator at mijn connection.nl.
Will the charging point come close to the utilities cupboard? Then the Complete installation package is all you need to be able to use your charging point immediately. Everything you need is included so you have nothing to worry about.
To the Store
All-in-1

Installation package Complete Plus

899
849
incl. VAT (€701.65 excl. VAT)

Including

  • Installation of the charging point within 2 to 3 weeks
  • Mounting on the wall
  • 2 year warranty on the installation
  • Call-out charges
  • Labor and transport With the exception of the Wadden Islands, additional charge on request
  • Placing an extra group in the meter cupboard (up to 32A) 1 or 3 phase earth leakage circuit breaker, depending on the meter box. Excluding extension box if required.
  • Explanation of how your new charging point works
  • Excavation and repavement up to 3 meters
  • Power cable 3 phase/4mm2 up to 15 meters
  • Data cable (UTP) up to 15 meters
  • Optional: Extra excavation and paving work excl. cables (€42.50 per meter incl. VAT)
  • Optional: Extra excavation and paving work incl. power cable and UTP (€55 per meter incl. VAT)
  • Optional: Upgrade from 4mm2 to 6mm2 power cable (€6 per meter incl. VAT) If you expect to charge with capacities higher than 16A/11kW, we recommend a 6mm2 upgrade.
  • Optional: Pole mounting instead of wall mounting incl. buried pole and mounting charging point (€72.50 incl. VAT) Charging via 3 phases at the same time is the fastest. If you have a 1-phase connection and you would like to charge 3 phases, you can request a conversion from your grid operator at mijn connection.nl.
  • Optional: Extension box for 1 earth leakage circuit breaker incl. mounting (€42.50 incl. VAT) If there is no room for the earth leakage circuit breaker in the group box, we will install an extension box
  • Optional: Adjust group cabinet from 1 to 3 phases incl. main switch, excl. application network manager (€169 incl. VAT) Charging via 3 phases at the same time is the fastest. If you have a 1-phase connection and you would like to charge 3 phases, you can request a conversion from your grid operator at mijn connection.nl.
With Complete Plus, the charging point can be placed even further away from the meter cupboard. Is 15 meters of cable and 3 meters of excavation not far enough? No problem, any distance is possible in consultation. Order the installation package together with the charge point and we will contact you for the details.
to the store

Installation FAQs

Installation (9)

Categorie: Installation

The installation of the charge point is usually completed within 2 to 3 weeks after your order. Due to busy areas in your district, this period may differ, but we will always try to carry out your installation as quickly as possible.

Categorie: Installation

Yes, if you want to adjust the group box from 1 to 3 phases, including a main switch but excluding request from the network operator, we can take care of that for you during installation.

We do not do the grid reinforcement ourselves, but your grid operator does it for you. For this they have to visit you after we have made the adjustments in the group cabinet. There are costs associated with this, which you can find on the website of your network operator.

Request your grid reinforcement via www.mijnconnector.nl, you have to do that yourself due to GDPR.

Our price for this option is included with the package of your choice and will be charged afterwards. After your order you can indicate in the online chimney form that we send you that you want to have your group box adjusted to 3 phases.

Categorie: Installation

Yes, pole mounting is possible as an option – as standard we mount the charger on the wall. The costs for this, including burying the pole and mounting the charging point, can be found on our installation page.

You can order the pole of your choice directly with the charger, just like the other options available for your charger. For a beautiful post, also consider our ChargeMakers wooden post - handmade from Douglas wood with a concrete base included. And the cables run neatly on the inside.

Categorie: Installation

For most of the used modifications of our packages we have the options and prices on our installation page. If you want to use one or more of these options, you can indicate this in the inspection form that we send you after ordering. The additional costs will be invoiced afterwards.

If your installation consists entirely of customization that does not fall under our standard packages, we will be happy to make a tailor-made offer for you.

Categorie: Installation

If you need extra cable because your charger moves further away from your meter box, optional extras are available for both power and data cables, as well as upgrades from 4mm2 to 6mm2 power cables.

The extra costs vary depending on the type of cable and the required length and the prices can be found on our installation page with the package of your choice.

Categorie: Installation

ChargeMakers offers a 2-year warranty on the installation of the charging point.

Categorie: Installation

Installation package Complete is suitable for situations in which the charging point is placed close to the meter cupboard and includes a power cable of a maximum of 10 meters and a UTP data cable of a maximum of 10 meters.

Installation package Complete Plus is intended for situations where more excavation and cable is required, with a power cable of up to 15 meters and a UTP data cable of up to 15 meters, as well as excavation and paving up to 3 meters included.

Categorie: Installation

After your order you will receive the link to our online chimney form for a remote chimney. You fill this in, including photos of the meter cupboard and information about your main connection, among other things.

As soon as we have received all your data and everything is correct, our installer will do the technical inspection to see whether the installation can be carried out or whether any changes are required. For example, because there is no room in the group box for the earth leakage circuit breaker or because your smart meter is not smart enough.

We will discuss the outcome of the inspection with you in order to arrive at a suitable installation plan and then we can start planning the installation. The 2-3 weeks lead time for installation will start from then on, because we have no influence on how long we spend on the fireplace and the outcome of the fireplace.

Categorie: Installation

After installing your charge point, you will receive an explanation of how it works from a professional installer.

That looks great!

Order the handmade wooden post from ChargeMakers with your charger in the Store