Rent charging stations and DC fast chargers for the construction site
Rent a charging station for your construction site by the week or month and connect it to the site power supply that's already there: from 16A three-phase power you can run one charge point, with 32A a dual-socket charger, and with 63A a mobile charging hub with six charge points or a 30kW DC fast charger for e-trucks and electric equipment. Plug & play, with no fixed installation — and when the project ends, we collect everything.
- In use year-round — inspected annually to NEN 3140
Mobile DC fast chargers charging electric construction equipment on site
What can you charge on a construction site power supply?
From a single mobile EV charger on site to a complete mobile charging hub or DC fast charger — here's what each connection can handle:
Mobile EV charger
1 charging point (11kW): the service van or pool car.
Mobile dual-socket EV charger
2 charging points: vans and visitors.
Charging hub or 30kW DC
A complete mobile charging hub with six charging points, or a 30kW DC fast charger for e-trucks and equipment.
Mobile fast chargers
80 to 300kW DC, for equipment and e-trucks that need to get back to work fast.
- All chargers are used outdoors on construction sites year-round and are inspected annually to NEN 3140.
Mobile DC fast charger charging electric equipment via CCS2
Fast charging electric equipment and e-trucks
For electric cranes, loaders and e-trucks, AC charging is often too slow. Our mobile 30kW DC fast charger runs on a regular 63A site connection and charges via CCS2 — this is how Hanab charges electric construction equipment on site with our mobile DC chargers. Need more power? There are also 80kW and 160kW units.
Site connection full? How to fit more charging points anyway
With dynamic load balancing multiple units work together as one system within your site connection: vehicles that are charging get power, and full ones give up their share. No digging, no data cables — everything runs wirelessly over 4G. Even during grid congestion, you just keep charging.
Let subcontractors pay for their own power
On construction sites, subcontractors' vans and equipment often charge too. With paid charging, they simply pay with their own charge card: you set the kWh rate, and we handle collection and payouts. The main contractor no longer pays for all the power — and everyone has access to charging.
Frequently Asked Questions
Which power connection do I need?
Three-phase power (CEE). A 16A supply is enough for one charging point; 32A supports a dual-socket EV charger, and 63A a complete mobile charging hub or a 30kW DC fast charger. When preparing the quote, we check what your site connection can handle.
Does it also work during grid congestion?
Yes — the chargers work on any three-phase connection, fixed or temporary, and with dynamic load balancing the total stays within what's available. That way, you can start charging while you wait for a grid upgrade.
Can the chargers handle construction site conditions?
Yes. They're used outdoors year-round at construction sites, depots and business premises, and all equipment is inspected annually to NEN 3140.
Can subcontractors pay for charging themselves?
Yes — via paid charging with their own charge card. You set the rate per kWh; we handle settlement and payouts. Available for rentals of 4 weeks or more.
How quickly can you have chargers on site?
We rent from our own fleet and schedule delivery and installation with you. Let us know in your request when you want to start, and we'll plan around that date.
Request a quote
- We review your site connection and schedule with you
- No obligation, no commitment






